Some time has passed since my last update on the re-model of 524 W. Austin Street. Here’s the latest. Nothing has happened! We’ve been waiting on the contractor to free time in his schedule to get going on the scheduled work. The problem has been that the re-model he’s doing on our residence has taken longer than anticipated (what a surprise).
It’s not his fault things have gone slow at our house. Unexpected things happen, something gets done wrong and has to be re-done, etc. Luckily, we are dealing with a contractor who is a perfectionist and is not willing to leave until it’s done right. It’s a good thing too because he’s not getting paid until its right!
Hopefully, they’ll be done at our house this week and be going big guns at Austin Street next week. First on the schedule is getting the houses rewired. Painting will commence, in earnest, as well. All told, the job should take about a month. I’ll take lots of pictures and post lots of updates as we really start to get in to it.
In other news, I completed the last of the three courses necessary to complete my GRI (Graduate Realtor Institute) designation yesterday. Soon I’ll be updating my website, cards, ads, etc. to reflect this accomplishment.
Fredericksburg Texas Property For Sale
0 comments on Anatomy Of A Re-model Iv
Add a comment
To add comments without entering your email and image verification, you must be logged in. Login or Join Blogster

