We’re about two weeks out from completion of our remodel in
Since the last installment, the guys have finished the bathroom (trim etc.), laid the “retro” vinyl tile in the bathroom and kitchen, replaced and re-glazed all the windows, installed and painted the two new front doors (with new hardware and locksets), replaced all the cabinet hardware and created the “cut-out” for the refrigerator. The items remaining include staining and sealing the wood floors, hanging the exterior window screens and screen doors, misc. trim clean-up and a few other “punch list” items too small to mention here.
As promised, I’ll post some before and after photos either here in the body of the blog or in an album.
To buy or sell property in



0 comments on Anatomy of a Remodel Ix
Add a comment
To add comments without entering your email and image verification, you must be logged in. Login or Join Blogster

